Forest Lake Alum Treatment
Project Description & Outcomes The Forest Lake Alum Treatment is currently scheduled to occur the week of September 25th to 29th. The Forest Lake Alum Treatment Project is a milestone …
Project Description & Outcomes The Forest Lake Alum Treatment is currently scheduled to occur the week of September 25th to 29th. The Forest Lake Alum Treatment Project is a milestone …
Project Description & Outcomes This whole-lake alum treatment project, completed in 2019, drastically improved the water quality of Moody Lake by addressing the internal phosphorus loading. Phosphorous is one of …
Project Description & Outcomes This project restored three degraded wetlands in the northwest portion of the Moody Lake subwatershed. Diagnostic monitoring efforts identified these wetlands as sources of high phosphorus …
Project Description & Outcomes This project utilized research conducted by the University of Minnesota to develop an enhanced street sweeping plan for the City of Forest Lake that optimizes removal …
Project Description & Outcomes This project involved restoration of two wetlands along the tributary that was identified as the single highest source of phosphorus loading to Bone Lake. These wetland …
Project Description & Outcomes The proposed project diverts flow from an existing ditch system in the Highway 35 drainage area, through a pre-treatment cell, and then diffuses the flow into …
Project Description & Outcomes This project will treat 50% of this subwatershed’s runoff with a multi-cell iron enhanced sand filtration (IESF) treatment system. The headwaters of Washington Judicial Ditch 6 …
Project Description & Outcomes The proposed projects include implementation of: The proposed projects are expected to remove total phosphorus loads discharging to Little Comfort Lake of 75 lb/yr from the …
Little Comfort Lake Phosphorus Reduction Projects Read More »
Project Description & Outcomes This project removed accumulated phosphorus-rich sediment from the northern portion of a wetland directly adjacent to Bone Lake that had a history of receiving direct livestock …
Project Description & Outcomes The proposed project will restore a wetland including sediment excavation and vegetation rehabilitation. The current wetland condition is partially drained by a small private ditch that …