Forest Lake Alum Treatment
Project Description & Outcomes The Forest Lake Alum Treatment is currently scheduled to occur the week of September 25th to 29th. The Forest Lake Alum Treatment Project is a milestone …
Project Description & Outcomes The Forest Lake Alum Treatment is currently scheduled to occur the week of September 25th to 29th. The Forest Lake Alum Treatment Project is a milestone …
Project Description & Outcomes The proposed project diverts flow from an existing ditch system in the Highway 35 drainage area, through a pre-treatment cell, and then diffuses the flow into …
Project Description & Outcomes This project will treat 50% of this subwatershed’s runoff with a multi-cell iron enhanced sand filtration (IESF) treatment system. The headwaters of Washington Judicial Ditch 6 …
Project Description & Outcomes The proposed projects include implementation of: The proposed projects are expected to remove total phosphorus loads discharging to Little Comfort Lake of 75 lb/yr from the …
Little Comfort Lake Phosphorus Reduction Projects Read More »
Project Description & Outcomes The proposed project will restore a wetland including sediment excavation and vegetation rehabilitation. The current wetland condition is partially drained by a small private ditch that …
Project Description & Outcomes This project involves multiple best management practices in order to reduce phosphorus loading to Moody Lake by a total of 62 pounds per year and reduce …